The variables that matter most here
1. Access
If a concrete truck can reach the plot, concrete arrives efficiently. If it cannot, everything is smaller, slower and more expensive - and you may have to build a road first. Access is usually the single largest hidden variable on this island.
2. Slope and earthworks
A flat plot needs a platform. A steep plot needs cutting, hauling, batters and retaining. Moving and removing earth is plant and time, and on a tight site it is slow work.
3. Retaining structures
Retaining is structural concrete and reinforcement holding saturated soil. It is priced by what it has to hold, not by how it looks. Several walls on a sloped plot can be a meaningful share of a build.
4. Drainage and infrastructure
Drainage, water storage, service trenching and tank bases are rarely in an architect's headline number, and they are not optional here. See external works explained.
5. Specification
Structure is relatively predictable. Finishes are not. Imported tiling, joinery, glazing, sanitaryware, air conditioning, pool finishes and smart systems can move a budget enormously without changing a single dimension on the drawings.
6. Island logistics
Materials come across by ferry. Some items are readily available locally; others have a lead time and a transport cost. Programme and delivery planning are part of the price of building here.
7. Professional fees and permissions
Architectural design, engineering, and the permissions process sit outside construction cost. Budget for them separately, and take advice locally on what your specific project requires.
How to get a number that means something
- Establish access and ground conditions with a site visit.
- Separate the budget into land preparation and access, structure, finishes, and external works. These behave very differently.
- Have architectural and engineering drawings for the building before expecting a firm building price.
- Price external works as their own scope rather than a percentage guess.
- Decide the finish level early - it is the easiest place for a budget to drift.
The cheapest savings are early
Choices made in the first month - where the building sits, how the access is routed, how water is handled - affect cost far more than the tile you choose in month ten. That is the real argument for getting a construction company onto the plot early, while those decisions are still open.